Core Areas:
Konza Keywords:
Date Range:
Friday, January 1, 2010 to Thursday, December 31, 2020
Publication Date:
Tuesday, February 21, 2023
Owner/Creator:
Contact:
Additional Project roles:
Role:
Associated Researcher
We surveyed in-stream moss cover upstream of the weirs on watersheds N2B and N4D in May of 2011 (immediately after the cutting treatment) during baseflow and 8 Jan 2021 under dry conditions. Briefly, a 1/4 m2 quadrat was randomly placed within the active stream channel every 6 meters along the stream channel until 10 transects in the main channel of N2B and N4D were sampled. The square quadrat had a grid with 50 equally sized sub-quadrats and proportion of moss cover was estimated for each sub-quadrat. The data are represented as the proportion of moss cover.
completed